EV Charger Installation in Danville, CA

Danville homes skew older than most of the Tri-Valley. About 57 percent went up between 1960 and 1989, and only about 6 percent date from 2000 or later. That puts the electrical panel at the center of almost every charger job here.


We connect Danville homeowners with local electricians who handle Level 2 chargers, Tesla Wall Connectors, NEMA 14-50 outlets and panel upgrades. The electrician prepares the plans the Town asks for, pulls the permit and closes it with a final inspection.


Call (925) 241-5744 or send the form. Tell us your car, your charger and your panel size. A local electrician calls you back to set up an estimate.

Request a Callback

Level 2 Home Chargers in Danville

Expedited Review Under Town Code

Danville Municipal Code 10-17 sets up an expedited permit path for EV chargers. A single-family application that meets every item on the Town's checklist moves through expedited review. Miss one item and it falls back to standard review, so a complete package saves time.

What the Danville Package Includes

The Building Division asks for the charger's specs and install guide, a single-line electrical diagram, and a site plan drawn to scale that shows the panel location relative to the charger. Equipment needs a UL 2202 or UL 2200 listing.

Load Calculation on Every Job

The Danville checklist calls for a load calculation worksheet under California Electrical Code 220. The charger circuit is sized at 125 percent of the continuous load. If the math shows the panel falls short, the upgrade goes on the same plans.

Big Chargers and Long Runs

A 9.6 kW charger on a 50 amp or larger circuit needs a circuit card with calculations. Units over 60 amps need a disconnect within 50 feet. A trench to a detached garage or driveway post needs at least 18 inches of cover for direct burial.

Panel Upgrades and Load Management in Danville

1960s and 1970s Panels

About 41 percent of Danville homes were built in the 1960s and 1970s. Many still run their original service. The plans must show the panel's amperage and whether the schedule has room for another breaker, so the electrician checks that first.

Load Management Before a Service Upgrade

A load management device or a smart panel holds the charger back when the house draws heavy power. On an older Danville panel it can avoid a full service upgrade and the PG&E wait that comes with one. Ask for both options in writing.

MCE and PG&E

Danville joined MCE in 2018. MCE supplies the electricity by default, and PG&E delivers it and sends one monthly bill. Check both for current EV rate plans before you set your charging schedule.

What Danville Homeowners Should Know

The Permit Does Not

Wait on Your HOA

Danville code bars the Building Official from making a charger permit depend on HOA approval. Your HOA can still have its own process, and state law limits how far it can restrict a charger.

Building Division Contact

Danville Building Division, 500 La Gonda Way. Call 925-314-3330 or email building@danville.ca.gov with permit questions.

Commercial and Multifamily

Danville publishes separate EV charging checklists for commercial and multifamily projects. Tell us the number of stalls and the service size you have.