EV Charger Installation in Livermore, CA

Free quote and on-site load calculation.


We install Level 2 chargers, Tesla Wall Connectors and panel upgrades.


Level 2 install: $1,200 to $2,500. Typical for a charger 20 to 40 feet from the panel, with labor, materials and permit.


A permit on every charger. Livermore requires a building permit for every residential EV charger.


Load calc under 200 amps. The city wants a load calculation when the service panel is under 200 amps.


Disconnect over 60 amps. A charger rated over 60 amps needs a disconnect within sight. Any panel upgrade goes on the same plans. Call (925) 241-5744 to start.

Request a Free Quote

Free quote. No obligation. No pressure.

Level 2 Home Chargers in Livermore

A Building Permit for Every Charger

Livermore's Permit Center handout says a residential EV charger needs a building permit. We file it, so your charger gets inspected and closed out.

What the Livermore Plan Shows

An 8.5 by 11 inch electrical plan with the panel rating and location, the charger load and circuit size, the charging level and the manufacturer cut sheets.

Load Calculation Under 200 Amps

The city asks for a load calculation when the service panel is under 200 amps. It shows whether the charger fits as is, needs load management or needs a bigger service.

Mounting Height and Disconnects

The charger mounts at least 18 inches up indoors and 24 inches up outdoors. Anything rated over 60 amps gets a disconnect within sight.

Livermore EV Charger Permit Facts

Livermore runs home chargers through its Permit Center with a one-page electrical plan and a checklist. Here is what the city asks for.

Permit officeCity of Livermore Permit Center
Permit requiredA building permit for every residential or duplex EV charger
Plan sheet8.5 x 11 inch electrical plan: panel rating and location, charger load, circuit size, charging level, cut sheets
Load calculationRequired when the service panel is under 200 amps
DisconnectWithin sight for chargers rated over 60 amps
Mounting heightAt least 18 inches indoors, 24 inches outdoors
New constructionEV Charging Ordinance (Jan 1, 2023) requires more chargers than state code
Livermore homes87,966 residents (2020 Census), 84,867 (July 2024 estimate). 71% of households own their home (2020).

Sources: City of Livermore Permit Center, Electric Vehicle Charging Stations handout and checklist; City of Livermore EV charging page; U.S. Census Bureau 2020 Census and 2024 estimate; MTC Bay Area Census 2020.

Panels Under 200 Amps

Under 200 amps is the line where Livermore wants a load calculation. We run it before we quote, so you know the plan before the permit goes in.

Load Management Before a Service Upgrade

A load management device or a smart panel holds the charger back when the house draws heavy power. It often costs less than a new service and skips the PG&E wait.

Ava Community Energy and PG&E

Livermore partners with Ava Community Energy on public fast-charging hubs. PG&E delivers the power to your home. Check both for current EV rate plans before you set a charging schedule.

What Livermore Homeowners Should Know

New Homes Get

More Chargers

Livermore's EV Charging Ordinance took effect Jan 1, 2023. New homes must include more charging than state code requires. Older homes add it with a permit.

Second Meter Option

The city checklist asks whether a second electric meter goes in for the charger. We settle that with you before we file.

Commercial and Multifamily

Multifamily and commercial charger projects need a Site Plan Design Review plus a building permit. Tell us the number of stalls and the service size.

Ready to charge at home in Livermore?

We also handle EV charger installation in Dublin, CA and electrical panel upgrades across the Tri-Valley.